Beta
N.Y. LIE
Lien Law
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Always check the official source for the current text.
§ 1 Short title
§ 1. Short title. This chapter shall be known as the "lien law."
§ 2 Definitions
§ 2. Definitions. 1. Lienor. The term "lienor," when used in this
chapter, means any person having a lien upon property by virtue of its
provisions, and includes his successor in interest.
2. Real property. The term "real property," when used in this chapter,
includes real estate, lands, tenements and hereditaments, corporeal and
incorporeal, fixtures, and all bridges and trestle work, and structures
connected therewith, erected for the use of railroads, and all oil or
gas wells and structures and fixtures connected therewith, and any lease
of oil lands or other right to operate for the production of oil or gas
upon such lands, and the right of franchise granted by a public
corporation for the use of the streets or public places thereof, and all
structures placed thereon for the use of such right or franchise.
3. Owner. The term "owner," when used in this chapter, includes the
owner in fee of real property, or of a less estate therein, a lessee for
a term of years, a vendee in possession under a contract for the
purchase of such real property, and all persons having any right, title
or interest in such real property, which may be sold under an execution
in pursuance of the provisions of statutes relating to the enforcement
of liens of judgment, and all persons having any right or franchise
granted by a public corporation to use the streets and public places
thereof, and any right, title or interest in and to such franchise. The
purchaser of real property at a statutory or judicial sale shall be
deemed the owner thereof from the time of such sale. If the purchaser at
such sale fails to complete the purchase, pursuant to the terms of the
sale, all liens created by his consent after such sale shall be a lien
on any deposit made by him and not on the real property sold.
4. Improvement. The term "improvement," when used in this chapter,
includes the demolition, erection, alteration or repair of any structure
upon, connected with, or beneath the surface of, any real property and
any work done upon such property or materials furnished for its
permanent improvement, and shall also include any work done or materials
furnished in equipping any such structure with any chandeliers, brackets
or other fixtures or apparatus for supplying gas or electric light and
shall also include the drawing by any architect or engineer or surveyor,
of any plans or specifications or survey, which are prepared for or used
in connection with such improvement and shall also include the value of
materials actually manufactured for but not delivered to the real
property, and shall also include the reasonable rental value for the
period of actual use of machinery, tools and equipment and the value of
compressed gases furnished for welding or cutting in connection with the
demolition, erection, alteration or repair of any real property, and the
value of fuel and lubricants consumed by machinery operating on the
improvement, or by motor vehicles owned, operated or controlled by the
owner, or a contractor or subcontractor while engaged exclusively in the
transportation of materials to or from the improvement for the purposes
thereof and shall also include the performance of real estate brokerage
services in obtaining a lessee for a term of more than three years of
all or any part of real property to be used for other than residential
purposes pursuant to a written contract of brokerage employment or
compensation.
5. Cost of improvement. The term "cost of improvement," when used in
this chapter, means expenditures incurred by the owner in paying the
claims of a contractor, an architect, engineer or surveyor, a
subcontractor, laborer and materialman, arising out of the improvement,
and in paying the amount of taxes based on payrolls including such
persons and withheld or required to be withheld and taxes based on the
purchase price or value of materials or equipment required to be
installed or furnished in connection with the performance of the
improvement, payment of taxes and unemployment insurance and other
contributions due by reason of the employment out of which any such
claim arose, and payment of any benefits or wage supplements or the
amounts necessary to provide such benefits or furnish such supplements,
to the extent that the owner, as employer, is obligated to pay or
provide such benefits or furnish such supplements by any agreement to
which he is a party, and shall also include fair and reasonable sums
paid for obtaining building loan and subsequent financing, premiums on
bond or bonds filed pursuant to section thirty-seven of this chapter or
required by any such building loan contract or by any lease to be
mortgaged pursuant thereto, or required by any mortgage to be
subordinated to the building loan mortgage, premiums on bond or bonds
filed to discharge liens, sums paid to take by assignment prior existing
mortgages, which are consolidated with building loan mortgages and also
the interest charges on such mortgages, sums paid to discharge or reduce
the indebtedness under mortgages and accrued interest thereon and other
encumbrances upon real estate existing prior to the time when the lien
provided for in this chapter may attach, sums paid to discharge building
loan mortgages whenever recorded, taxes, assessments and water rents
existing prior to the commencement of the improvement, and also those
accruing during the making of the improvement, and interest on building
loan mortgages, ground rent and premiums on insurance likewise accruing
during the making of the improvement. The application of the proceeds of
any building loan mortgage or other mortgage to reimburse the owner for
any payments made for any of the above mentioned items for said
improvement prior to the date of the initial advance received under the
building loan mortgage or other mortgage shall be deemed to be an
expenditure within the "cost of improvement" as above defined; provided,
however, such payments are itemized in the building loan contract and/or
other mortgage other than a building loan mortgage, and provided
further, that the payments have been made subsequent to the commencement
of the improvement.
5-a. Benefits and wage supplements. The term "benefits and wage
supplements" as used in this chapter means all remuneration for
employment paid in any medium other than cash, or reimbursement for
expenses, or any payments which are not "wages" within the meaning of
the law, including, but not limited to, health, welfare,
non-occupational disability, retirement, vacation benefits, holiday pay
and life insurance.
6. Public corporation. The term "public corporation," when used in
this chapter, means a municipal corporation or a district corporation or
a public benefit corporation as such corporations are defined in section
three of the general corporation law.
7. Public improvement. The term "public improvement," when used in
this chapter, means an improvement of any real property belonging to the
state or a public corporation; however, if the beneficial interest of an
improvement is in an entity other than the state or a public corporation
notwithstanding legal title being vested in an industrial development
agency created under article eighteen-A of the general municipal law,
then such improvement shall be considered an improvement of real
property subject to mechanics' liens on real property as provided in
section three of this chapter. Nothing contained in this section shall
create or be deemed to create any liability upon any industrial
development agency for the payment of the cost of any improvement, or
otherwise. For the purposes of this subdivision the term "beneficial
interest" shall mean the beneficial incidents of ownership of the
improvement to include, but not be limited to, the right to possession,
the right to claim tax benefits, if any, and the right to purchase or
secure title to the improvement pursuant to an executory contract of
sale, option agreement or lease.
8. Improvement of real property. The term "improvement of real
property," when used in this chapter, means any improvement of real
property not belonging to the state or a public corporation.
9. Contractor. The term "contractor," when used in this chapter, means
a person who enters into a contract with the owner of real property for
the improvement thereof, or with the state or a public corporation for a
public improvement.
10. Subcontractor. The term "subcontractor" when used in this chapter,
means a person who enters into a contract with a contractor and/or with
a subcontractor for the improvement of such real property or such public
improvement or with a person who has contracted with or through such
contractor for the performance of his contract or any part thereof.
11. Laborer. The term "laborer," when used in this chapter, means any
person who performs labor or services upon such improvement.
12. Materialman. The term "materialman" when used in this chapter,
means any person who furnishes material or the use of machinery, tools,
or equipment, or compressed gases for welding or cutting, or fuel or
lubricants for the operation of machinery or motor vehicles, either to
an owner, contractor or subcontractor, for, or in the prosecution of
such improvement.
The expression "furnishes material" or other similar expression
wherever used in this chapter, shall be deemed to mean and include the
reasonable rental value for the period of actual use of machinery, tools
or equipment, and the value of compressed gases furnished for welding or
cutting, and the value of fuel and lubricants consumed by machinery
operating on, or by motor vehicles owned, operated or controlled by the
owner, or a contractor or subcontractor while engaged exclusively in the
transportation of materials to or from the improvement for the purposes
thereof.
13. Building loan contract. The term "building loan contract," when
used in this chapter, means a contract whereby a party thereto, in this
chapter termed "lender," in consideration of the express promise of an
owner to make an improvement upon real property, agrees to make advances
to or for the account of such owner to be secured by a mortgage on such
real property, whether such advances represent moneys to be loaned or
represent moneys to be paid in purchasing from or in selling for such
owner bonds or certificates secured by such mortgage upon such real
property, providing, however, nothing herein contained shall be deemed
to construe as a building loan contract a preliminary application for a
building loan made by such owner and accepted by such lender if,
pursuant to such application and acceptance, a building loan contract is
thereafter entered into between the owner and the lender and filed as
provided in section twenty-two of this chapter.
14. Building loan mortgage. The term "building loan mortgage," when
used in this chapter, means a mortgage made pursuant to a building loan
contract and includes an agreement wherein and whereby a building loan
mortgage is consolidated with existing mortgages so as to constitute one
lien upon the mortgaged property.
15. Subsequent financing. By the term "subsequent financing" is meant
moneys borrowed upon the security of the improvement after the recording
of a building loan contract and/or mortgage other than a building loan
mortgage upon the premises to be improved and within four months after
the completion thereof.
16. Prior mortgage. By the term "prior mortgage" is meant a mortgage
on real property and/or leasehold recorded prior to the commencement of
an improvement thereon.
17. Consideration. The term "consideration" when used in this chapter,
includes real property as defined in section two hereof, and personal
property as defined in section thirty-nine of the general construction
law.
18. Advances. The term "advances" when used in this chapter, includes
money, real property as defined in section two hereof and/or personal
property as defined in section thirty-nine of the general construction
law.
19. Funds. The term "funds" when used in this chapter, includes money,
real property as defined in section two hereof and/or personal property
as defined in section thirty-nine of the general construction law.
20. Persons. The term "persons" when used in this chapter, includes an
individual, partnership, association, trust or corporation.
§ 3 Mechanic's lien on real property
§ 3. Mechanic's lien on real property. A contractor, subcontractor,
laborer, materialman, landscape gardener, nurseryman or person or
corporation selling fruit or ornamental trees, roses, shrubbery, vines
and small fruits, who performs labor or furnishes materials for the
improvement of real property with the consent or at the request of the
owner thereof, or of his agent, contractor or subcontractor, and any
trust fund to which benefits and wage supplements are due or payable for
the benefit of such laborers, shall have a lien for the principal and
interest, of the value, or the agreed price, of such labor, including
benefits and wage supplements due or payable for the benefit of any
laborer, or materials upon the real property improved or to be improved
and upon such improvement, from the time of filing a notice of such lien
as prescribed in this chapter. Where the contract for an improvement is
made with a husband or wife and the property belongs to the other or
both, the husband or wife contracting shall also be presumed to be the
agent of the other, unless such other having knowledge of the
improvement shall, within ten days after learning of the contract give
the contractor written notice of his or her refusal to consent to the
improvement. Within the meaning of the provisions of this chapter,
materials actually manufactured for but not delivered to the real
property, shall also be deemed to be materials furnished.
§ 4 Extent of lien
§ 4. Extent of lien. (1) Such lien shall extend to the owner's right,
title or interest in the real property and improvements, existing at the
time of filing the notice of lien, or thereafter acquired, except as
hereinafter in this article provided. If an owner assigns his interest
in such real property by a general assignment for the benefit of
creditors, within thirty days prior to such filing, the lien shall
extend to the interest thus assigned. If any part of the real property
subjected to such lien be removed by the owner or by any other person,
at any time before the discharge thereof, such removal shall not affect
the rights of the lienor, either in respect to the remaining real
property, or the part so removed. If labor is performed for, or
materials furnished to, a contractor or subcontractor for an
improvement, the lien shall not be for a sum greater than the sum earned
and unpaid on the contract at the time of filing the notice of lien, and
any sum subsequently earned thereon. In no case shall the owner be
liable to pay by reason of all liens created pursuant to this article a
sum greater than the value or agreed price of the labor and materials
remaining unpaid, at the time of filing notices of such liens, except as
hereinafter provided.
(2) Such lien shall not extend to the owner's right, title or interest
in real property and improvements, existing at the time of filing the
notice of lien if such lien arises from the failure of a lessee of the
right to explore, develop or produce natural gas or oil, to pay for,
compensate or render value for improvements made with the consent or at
the request of such lessee by a contractor, subcontractor, materialman,
equipment operator or owner, landscaper, nurseryman, or person or
corporation who performs labor or furnishes materials for the
exploration, development, or production of oil or natural gas or
otherwise improves such leased property. Such lien shall extend to the
improvements made for the exploration, development and production of oil
and natural gas, and the working interest held by a lessee of the right
to explore, develop or produce oil and natural gas.
(3) Notwithstanding subdivision two if a property owner is also a
developer of oil and gas resources and is a party to an agreement with a
person or firm authorized to perfect a lien arising out of the failure
of such developer to compensate or render value for improvements to the
property upon which an oil or gas well is drilled or established, the
lien shall extend to the owners' right or interest in such real
property.
§ 4-A Insurance proceeds liable for demands
§ 4-a. Insurance proceeds liable for demands. Owner, contractor or
subcontractor diverting proceeds, guilty of larceny. The proceeds of any
insurance which by the terms of the policy are payable to the owner of
real property improved, and actually received or to be received by him
because of the destruction or removal by fire or other casualty of an
improvement on which lienors have performed labor or services or for
which they have furnished materials, shall after the owner has been
reimbursed therefrom for premiums paid by him, if any, for such
insurance, be subject to liens provided by this act to the same extent
and in the same order of priority as the real property would have been
had such improvement not been so destroyed or removed.
The proceeds of any insurance which by the terms of the policy are
payable to a contractor or subcontractor, and actually received or to be
received by him because of the destruction or removal by fire or other
casualty of an improvement on which he has performed labor or services
or for which he has furnished materials, shall, after such contractor or
subcontractor has been reimbursed therefrom for premiums paid by him, if
any, for such insurance, be liable for the payment of demands for labor
or services performed or materials furnished by his order and for which
he is liable, in the same manner and under the same conditions as
payments to him under his contract would have been had such improvement
not been so destroyed or removed.
§ 5 Liens under contracts for public improvements
§ 5. Liens under contracts for public improvements. A person
performing labor for or furnishing materials to a contractor, his or her
subcontractor or legal representative, for the construction or
demolition of a public improvement pursuant to a contract by such
contractor with the state or a public corporation, and any trust fund to
which benefits and wage supplements are due or payable for the benefit
of such person performing labor, shall have a lien for the principal and
interest of the value or agreed price of such labor, including benefits
and wage supplements due or payable for the benefit of any person
performing labor, or materials upon the moneys of the state or of such
corporation applicable to the construction or demolition of such
improvement, to the extent of the amount due or to become due on such
contract, and under a judgment of the court of claims awarded to the
contractor for damages arising from the breach of such contract by the
state, or awarded for furnishing labor or materials not contemplated by
the provisions of said contract, upon filing a notice of lien as
prescribed in this article, except as hereinafter in this article
provided. Where no public fund has been established for the financing of
a public improvement with estimated cost in excess of two hundred fifty
thousand dollars, the chief financial officer of the public owner shall
require the private entity for whom the public improvement is being made
to post, or cause to be posted, a bond or other form of undertaking
guaranteeing prompt payment of moneys due to the contractor, his or her
subcontractors and to all persons furnishing labor or materials to the
contractor or his or her subcontractors in the prosecution of the work
on the public improvement.
§ 6 Liens for labor on railroads
§ 6. Liens for labor on railroads. Any person who shall hereafter
perform any labor for a railroad corporation shall have a lien for the
value of such labor upon the railroad track, rolling-stock and
appurtenances of such railroad corporation and upon the land upon which
such railroad track and appurtenances are situated, by filing a notice
of such lien in the office of the clerk of any county wherein any part
of such railroad is situated, to the extent of the right, title and
interest of such corporation in such property, existing at the time of
such filing. The provisions of this article relating to the contents,
filing and entry of a notice of a mechanic's lien, and the priority and
duration thereof, shall apply to such liens. A copy of the notice of
such lien shall be personally served upon such corporation within ten
days after the filing thereof in the manner prescribed by the justice
court act for the service of summons in actions in justices' courts
against domestic railroad corporations.
§ 7 Liability for advance payments, collusive mortgages and incumbrances
§ 7. Liability for advance payments, collusive mortgages and
incumbrances. Any payment by the owner, contractor or subcontractor upon
a contract for the improvement of real property, made prior to the time
when, by the terms of the contract, such payment becomes due, for the
purpose of avoiding the provisions of this article, shall be of no
effect as against the lien of a subcontractor, laborer, or materialman
under such contract, created before such payment actually becomes due. A
conveyance, mortgage, lien or incumbrance made by an owner of real
property, for the purpose of avoiding the provisions of this article,
with the knowledge or privity of the person to whom the conveyance is
made or in whose favor the mortgage, lien or incumbrance is created,
shall be void and of no effect as against a claim on account of the
improvement of such real property, existing at the time of the making of
the conveyance or the creation of such mortgage, lien or incumbrance.
Nothing in this chapter shall subject the title of a purchaser of real
property for value whose conveyance is recorded prior to the filing of a
lien pursuant to this chapter to any such lien, provided the instrument
of conveyance contains the provisions mentioned in subdivision five of
section thirteen.
§ 8 Terms of contract may be demanded
§ 8. Terms of contract may be demanded. A statement of the terms of a
contract made between an owner and a contractor, pursuant to which an
improvement of real property is being made, and, of the amount due or to
become due thereon shall be furnished upon demand in writing by the
owner, or his duly authorized agent, to a subcontractor, laborer or
material man performing labor for or furnishing materials to a
contractor, or subcontractor, under such contract. If, within thirty
days of such demand the owner refuses or neglects to furnish such
statement or falsely states the terms of such contract or the amount due
or to become due thereon, and a subcontractor, laborer or material man
has not been paid the amount of his claim against a contractor or
subcontractor, under such contract, and a judgment has been obtained and
execution issued against such contractor or subcontractor and returned
wholly or partly unsatisfied, the owner shall be liable for the loss
sustained by reason of such refusal, neglect or false statement, and the
lien of such subcontractor, laborer or material man, filed as prescribed
in this article, against the real property improved for the labor
performed or materials furnished after such demand, shall exist to the
same extent and be enforced in the same manner as if such labor and
materials had been directly performed for and furnished to such owner.
§ 9 Contents of notice of lien
§ 9. Contents of notice of lien. The notice of lien shall state:
1. The name and residence of the lienor; and if the lienor is a
partnership or a corporation, the business address of such firm, or
corporation, the names of partners and principal place of business, and
if a foreign corporation, its principal place of business within the
state.
1-a. The name and address of the lienor's attorney, if any.
2. The name of the owner of the real property against whose interest
therein a lien is claimed, and the interest of the owner as far as known
to the lienor.
3. The name of the person by whom the lienor was employed, or to whom
he furnished or is to furnish materials; or, if the lienor is a
contractor or subcontractor, the person with whom the contract was made.
4. The labor performed or materials furnished and the agreed price or
value thereof, or materials actually manufactured for but not delivered
to the real property and the agreed price or value thereof.
5. The amount unpaid to the lienor for such labor or materials.
6. The time when the first and last items of work were performed and
materials were furnished.
7. The property subject to the lien, with a description thereof
sufficient for identification; and if in a city or village, its location
by street and number, if known; whether the property subject to the lien
is real property improved or to be improved with a single family
dwelling or not. A failure to state the name of the true owner or
contractor, or a misdescription of the true owner, shall not affect the
validity of the lien. The notice must be verified by the lienor or his
agent, to the effect that the statements therein contained are true to
his knowledge except as to the matters therein stated to be alleged on
information and belief, and that as to those matters he believes it to
be true.
§ 10 Filing of notice of lien
§ 10. Filing of notice of lien. 1. Notice of lien may be filed at any
time during the progress of the work and the furnishing of the
materials, or, within eight months after the completion of the contract,
or the final performance of the work, or the final furnishing of the
materials, dating from the last item of work performed or materials
furnished; provided, however, that where the improvement is related to
real property improved or to be improved with a single family dwelling,
the notice of lien may be filed at any time during the progress of the
work and the furnishing of the materials, or, within four months after
the completion of the contract, or the final performance of the work, or
the final furnishing of the materials, dating from the last item of work
performed or materials furnished; and provided further where the notice
of lien is for retainage, the notice of lien may be filed within ninety
days after the date the retainage was due to be released; except that in
the case of a lien by a real estate broker, the notice of lien may be
filed only after the performance of the brokerage services and execution
of lease by both lessor and lessee and only if a copy of the alleged
written agreement of employment or compensation is annexed to the notice
of lien, provided that where the payment pursuant to the written
agreement of employment or compensation is to be made in installments,
then a notice of lien may be filed within eight months after the final
payment is due, but in no event later than a date five years after the
first payment was made. For purposes of this section, the term "single
family dwelling" shall not include a dwelling unit which is a part of a
subdivision that has been filed with a municipality in which the
subdivision is located when at the time the lien is filed, such property
in the subdivision is owned by the developer for purposes other than his
personal residence. For purposes of this section, "developer" shall mean
and include any private individual, partnership, trust or corporation
which improves two or more parcels of real property with single family
dwellings pursuant to a common scheme or plan. The notice of lien must
be filed in the clerk's office of the county where the property is
situated. If such property is situated in two or more counties, the
notice of lien shall be filed in the office of the clerk of each of such
counties. The county clerk of each county shall provide and keep a book
to be called the "lien docket," which shall be suitably ruled in columns
headed "owners," "lienors," "lienor's attorney," "property," "amount,"
"time of filing," "proceedings had," in each of which he shall enter the
particulars of the notice, properly belonging therein. The date, hour
and minute of the filing of each notice of lien shall be entered in the
proper column. Except where the county clerk maintains a block index,
the names of the owners shall be arranged in such book in alphabetical
order. The validity of the lien and the right to file a notice thereof
shall not be affected by the death of the owner before notice of the
lien is filed.
2. Where the county clerk indexes liens in a block index, every notice
of lien presented to the clerk of a county of filing, in order to
entitle the same to be filed, shall contain in the body thereof, or
shall have endorsed thereon, a designation of the number of every block,
on the land map of the county, which is affected by the notice of lien.
The county clerk shall cause such notice of lien to be entered in the
block index suitably ruled to contain the columns listed in the
preceding paragraph, under the block number of every block so
designated. In cases where a notice of lien shall have been filed
without such designation or with an erroneous designation, the county
clerk, on presentation of proper proof thereof, shall enter such
instrument in the proper index, under the proper block number of every
block in which the land affected is situated, and shall, at the same
time, make a note of such entry and of the date thereof in every place
in which such instrument may have been erroneously indexed, opposite the
entry thereof, and also upon the instrument itself, if the same be in
his possession or produced to him for the purpose, and the filing of
such instrument shall be constructive notice as to property in the block
not duly designated at the time of such filing only from the time when
the same shall be properly indexed.
A county clerk may adopt a new indexing system utilizing
electro-mechanical, electronic or any other method he deems suitable for
maintaining the indexes.
§ 11 Service of copy of notice of lien
§ 11. Service of copy of notice of lien. Within five days before or
thirty days after filing the notice of lien, the lienor shall serve a
copy of such notice upon the owner, if a natural person, (a) by
delivering the same to him personally, or if the owner cannot be found,
to his agent or attorney, or (b) by leaving it at his last known place
of residence in the city or town in which the real property or some part
thereof is situated, with a person of suitable age and discretion, or
(c) by registered or certified mail addressed to his last known place of
residence, or (d) if such owner has no such residence in such city or
town, or cannot be found, and he has no agent or attorney, by affixing a
copy thereof conspicuously on such property, between the hours of nine
o'clock in the forenoon and four o'clock in the afternoon; if the owner
be a corporation, said service shall be made (i) by delivering such copy
to and leaving the same with the president, vice-president, secretary or
clerk to the corporation, the cashier, treasurer or a director or
managing agent thereof, personally, within the state, or (ii) if such
officer cannot be found within the state by affixing a copy thereof
conspicuously on such property between the hours of nine o'clock in the
forenoon and four o'clock in the afternoon, or (iii) by registered or
certified mail addressed to its last known place of business. Failure to
file proof of such a service with the county clerk within thirty-five
days after the notice of lien is filed shall terminate the notice as a
lien. Until service of the notice has been made, as above provided, an
owner, without knowledge of the lien, shall be protected in any payment
made in good faith to any contractor or other person claiming a lien.
§ 11-A Notice of completion and acceptance may be demanded
§ 11-a. Notice of completion and acceptance may be demanded. 1. At any
time before the construction or demolition of a public improvement is
completed and accepted by the state or any political subdivision
thereof, or by a public corporation or within thirty days thereof a
person performing work for or furnishing materials to a contractor, his
subcontractor, assignee or legal representative may file a written
demand requiring notice of completion and acceptance be given to him
upon the happening of such event.
2. Such demand shall be filed with the head of the department or
bureau having charge of the construction or demolition. It shall state
the name and address of the one making the demand; the name of the
contractor or subcontractor for whom the labor was performed or
materials furnished; the estimated amount of the entire value thereof;
and a description of the public improvement upon which the labor was
performed or the materials furnished.
3. Within five days of any completion and acceptance in respect to
which a demand for notice has been filed pursuant to the provisions of
this section the head of the department or bureau issuing the same shall
cause written notice thereof to be mailed to the name and address of the
one making the demand as recited therein.
4. The failure by the state, public corporation or any officer or
employee thereof to give the notice required by this section shall not
give rise to any cause of action; extend any period of time within which
an act must be performed; or otherwise alter, affect or impair any other
right or duty.
§ 11-B Copy of notice of lien to a contractor or subcontractor
§ 11-b. Copy of notice of lien to a contractor or subcontractor.
Within five days before or thirty days after filing a notice of lien in
accordance with section ten of this chapter or the filing of an
amendment of notice of lien in accordance with section twelve-a of this
chapter the lienor shall serve a copy of such notice or amendment by
certified mail on the contractor, subcontractor, assignee or legal
representative for whom he was employed or to whom he furnished
materials or if the lienor is a contractor or subcontractor to the
person, firm or corporation with whom the contract was made. A lienor
having a direct contractual relationship with a subcontractor or a
sub-subcontractor but not with a contractor shall also serve a copy of
such notice or amendment by certified mail to the contractor. Failure to
file proof of such a service with the county clerk within thirty-five
days after the notice of lien is filed shall terminate the notice as a
lien. Any lienor, or a person acting on behalf of a lienor, who fails to
serve a copy of the notice of lien as required by this section shall be
liable for reasonable attorney's fees, costs and expenses, as determined
by the court, incurred in obtaining such copy.
§ 11-C Copy of notice of lien to a contractor or subcontractor with respect to public improvements liens
§ 11-c. Copy of notice of lien to a contractor or subcontractor with
respect to public improvements liens. Within five days before or
simultaneously with filing a notice of lien in accordance with section
twelve of this chapter or the filing of an amendment of a notice of lien
in accordance with section twelve-a of this chapter with respect to a
public improvement lien, the lienor shall serve a copy of such notice or
amendment by certified mail on the contractor, subcontractor, assignee
or legal representative for whom he was employed or to whom he furnished
materials or if the lienor is a contractor or subcontractor to the
person, firm or corporation with whom the contract was made. A lienor
having a direct contractual relationship with a subcontractor or a
sub-subcontractor but not with a contractor shall also serve a copy of
such notice or amendment by certified mail to the contractor. The notice
of lien so filed shall contain thereon or there shall be filed therewith
proof of service of a copy of said lien upon the parties required to be
served pursuant to this section, and failure to file proof of such
service shall render the notice of lien a nullity. Any lienor, or a
person acting on behalf of a lienor, who fails to serve a copy of the
notice of lien as required by this section shall be liable for
reasonable attorney's fees, costs and expenses, as determined by the
court, incurred in obtaining such copy.
§ 12 Notice of lien on account of public improvements
§ 12. Notice of lien on account of public improvements. At any time
before the construction or demolition of a public improvement is
completed and accepted by the state or by the public corporation, and
within thirty days after such completion and acceptance, a person
performing work for or furnishing materials to a contractor, his
subcontractor, assignee or legal representative, may file a notice of
lien with the head of the department or bureau having charge of such
construction or demolition and with the comptroller of the state or with
the financial officer of the public corporation, or other officer or
person charged with the custody and disbursements of the state or
corporate funds applicable to the contract under which the claim is
made. The notice shall state the name and residence of the lienor, the
name of the contractor or subcontractor for whom the labor was performed
or materials furnished, the amount claimed to be due or to become due,
the date when due, a description of the public improvement upon which
the labor was performed and materials expended, the kind of labor
performed and materials furnished, and materials actually manufactured
for but not delivered to such public improvement, and give a general
description of the contract pursuant to which such public improvement
was constructed or demolished. If the lienor is a partnership or a
corporation, the notice shall state the business address of such
partnership or corporation, the names of the partners, and if a foreign
corporation, its principal place of business within the state. If the
name of the contractor or subcontractor is not known to the lienor, it
may be so stated in the notice, and a failure to state correctly the
name of the contractor or subcontractor shall not affect the validity of
the lien. The notice must be verified by the lienor or his agent, to the
effect that the statements therein contained are true to his own
knowledge, except as to the matters therein stated to be alleged on
information and belief, and that as to those matters he believes it to
be true. The comptroller of the state or the financial officer of the
public corporation or other officer or person charged with the custody
and disbursements of the state or corporate funds applicable to the
contract under which the claim is made shall enter the same in a book
provided for that purpose, to be called the "lien book". Such entry
shall include the name and residence of the lienor, the name of the
contractor or subcontractor, the amount of the lien and date of filing,
and a brief designation of the contract under which the lien arose.
§ 12-A Amendment
§ 12-a. Amendment. 1. Within sixty days after the original filing, a
lienor may amend his lien upon twenty days notice to existing lienors,
mortgagees and the owner, provided that no action or proceeding to
enforce or cancel the mechanics' lien has been brought in the interim,
where the purpose of the amendment is to reduce the amount of the lien,
except the question of wilful exaggeration shall survive such amendment.
2. In a proper case, the court may, upon five days' notice to existing
lienors, mortgagees and owner, make an order amending a notice of lien
upon a public or private improvement, nunc pro tunc. However, no
amendment shall be granted to the prejudice of an existing lienor,
mortgagee or purchaser in good faith, as the case may be.
§ 13 Priority of liens
13. Priority of liens. (1) A lien for materials furnished or labor
performed in the improvement of real property shall have priority over a
conveyance, mortgage, judgment or other claim against such property not
recorded, docketed or filed at the time of the filing of the notice of
such lien, except as hereinafter in this chapter provided; over advances
made upon any mortgage or other encumbrance thereon after such filing,
except as hereinafter in this article provided; and over the claim of a
creditor who has not furnished materials or performed labor upon such
property, if such property has been assigned by the owner by a general
assignment for the benefit of creditors, within thirty days before the
filing of either of such notices; and also over an attachment hereafter
issued or a money judgment hereafter recovered upon a claim, which, in
whole or in part, was not for materials furnished, labor performed or
moneys advanced for the improvement of such real property; and over any
claim or lien acquired in any proceedings upon such judgment. Such liens
shall also have priority over advances made upon a contract by an owner
for an improvement of real property which contains an option to the
contractor, his successor or assigns to purchase the property, if such
advances were made after the time when the labor began or the first item
of material was furnished, as stated in the notice of lien. If several
buildings are demolished, erected, altered or repaired, or several
pieces or parcels of real property are improved, under one contract, and
there are conflicting liens thereon, each lienor shall have priority
upon the particular part of the real property or upon the particular
building or premises where his labor is performed or his materials are
used. Persons shall have no priority on account of the time of filing
their respective notices of liens, but all liens shall be on a parity
except as hereinafter in section fifty-six of this chapter provided; and
except that in all cases laborers for daily or weekly wages shall have
preference over all other claimants under this article.
(1-a) Parties having assignments of moneys due or to become due under
a contract for the improvement of real property, unless such assignments
be set aside as diversions of trust assets as provided in article
three-a of this chapter, shall have priority as follows:
An assignee of moneys or any part thereof, due or to become due under
a contract for the improvement of real property, whose assignment is
duly filed prior to the filing of a notice of lien or assignment of
every other party to the action, shall have priority over those parties
to the extent of moneys advanced upon such assignment before the filing
of the notice of lien or assignment next subsequent to his assignment,
but as to moneys advanced subsequent to a notice of lien or assignment
filed and unsatisfied or not discharged such assignee for the purpose of
determining his proportionate share of moneys available for distribution
as provided in subdivision one of this section shall be treated as a
lienor having a lien to the extent of moneys so advanced.
An assignee of moneys or any part thereof, due or to become due under
a contract for an improvement of real property whose assignment is duly
filed subsequent to the filing of the notice of lien or assignment of
any other party shall for the purpose of determining his proportionate
share of moneys available for distribution, as provided in subdivision
one of this section be treated as a lienor having a lien to the extent
of moneys actually advanced upon such assignment prior to the filing
thereof.
(2) When a building loan mortgage is delivered and recorded a lien
shall have priority over advances made on the building loan mortgage
after the filing of the notice of lien; but such building loan mortgage,
whenever recorded, to the extent of advances made before the filing of
such notice of lien, shall have priority over the lien, provided it or
the building loan contract contains the covenant required by subdivision
three hereof, and provided the building loan contract is filed as
required by section twenty-two of this chapter. Every mortgage recorded
subsequent to the commencement of the improvement and before the
expiration of the period specified in section ten of this chapter for
filing of notice of lien after the completion of the improvement shall,
to the extent of advances made before the filing of a notice of lien,
have priority over liens thereafter filed if it contains the covenant
required by subdivision three hereof. The lien of a vendee under an
executory contract for the sale of land and the improvement thereof by
the construction of a building thereon shall, to the extent of amounts
paid thereunder to the vendor before the filing of a notice of lien,
have priority over liens filed after the contract or memorandum thereof
is recorded as provided in section two hundred ninety-four of the real
property law if the recorded contract or memorandum specifies the total
amount of payments made by the vendee or required by the contract to be
made by the vendee before conveyance of title.
(3) Every such building loan mortgage and every mortgage recorded
subsequent to the commencement of the improvement and before the
expiration of the period specified in section ten of this chapter for
filing of notice of lien after the completion of the improvement shall
contain a covenant by the mortgagor that he will receive the advances
secured thereby and will hold the right to receive such advances as a
trust fund to be applied first for the purpose of paying the cost of
improvement, and that he will apply the same first to the payment of the
cost of improvement before using any part of the total of the same for
any other purpose, provided, however, that if the party executing the
building loan contract is not the owner of the fee but is the party to
whom such advances are to be made, a building loan contract executed and
filed pursuant to section twenty-two of this chapter shall contain the
said covenant by such party executing such building loan contract, in
place of the covenant by the mortgagor in the building loan mortgage as
hereinbefore provided. Nothing in this subdivision shall be considered
as imposing upon the lender any obligation to see to the proper
application of such advances by the owner; and nothing in this section,
nor in that portion of section two of this chapter, defining "cost of
improvement" shall be deemed to impair or subordinate the lien of any
mortgage containing the covenant required by this subdivision. To the
extent that the trust res consists of the right to receive advances as
distinct from advances actually received, breach of the trust shall give
rise to a civil action only. The covenant provided for herein shall be
deemed to have been made and to be in full force and effect if, in lieu
of the foregoing provisions, a statement in substantially the following
form is contained in the mortgage or contract, "subject to the trust
fund provisions of section thirteen of the lien law."
(4) Nothing in subdivision two or three of this section shall apply to
any mortgage given by a purchaser for value from an owner making the
improvement and recorded prior to the filing of a lien pursuant to this
chapter, provided the instrument of conveyance contains the provisions
mentioned in subdivision five herein.
(5) No instrument of conveyance recorded subsequent to the
commencement of the improvement, and before the expiration of the period
specified in section ten of this chapter for filing of notice of lien
after the completion of the improvement, shall be valid as against liens
filed within a corresponding period of time measured from the recording
of such conveyance, unless the instrument contains a covenant by the
grantor that he will receive the consideration for such conveyance and
will hold the right to receive such consideration as a trust fund to be
applied first for the purpose of paying the cost of the improvement and
that he will apply the same first to the payment of the cost of the
improvement before using any part of the total of the same for any other
purpose. Nothing in this subdivision shall be construed as imposing upon
the grantee any obligation to see to the proper application of such
consideration by the grantor. Nothing in this subdivision shall apply to
a deed given by a referee or other person appointed by the court for the
sole purpose of selling real property. Nothing in this subdivision shall
apply to the consideration received by a grantor who, pursuant to a
written agreement entered into and duly recorded prior to the
commencement of the improvement, conveys to the person making such
improvement, the land upon which such improvement is made. However, such
a conveyance shall be subject to liens filed prior thereto, as provided
by this chapter. To the extent that the trust res consists of the right
to receive the consideration for such conveyance as distinct from the
consideration actually received, breach of the trust shall give rise to
a civil action only. The covenant provided for herein shall be deemed to
have been made and to be in full force and effect if, in lieu of the
foregoing provisions, a statement in substantially the following form is
contained in the instrument of conveyance, "subject to the trust fund
provisions of section thirteen of the lien law."
Except that this section shall not apply to any mortgage taken by the
home owners' loan corporation, a corporation created under an act of
congress, known as the "home owners' loan act of nineteen hundred
thirty-three," and the "home owners' loan act of nineteen hundred
thirty-three as amended," and said mortgage shall have priority over any
and all liens filed subsequent to the date of the recording of said
mortgage whether or not the cash and/or bonds for which said mortgage
has been taken as security, shall have been advanced at the time of the
execution of such mortgage or subsequent thereto, and it shall not be
necessary to execute and file any building loan contract or any other
contract, in compliance with this section or any part thereof.
(6) Every assignment of moneys, or any part thereof, due or to become
due under a contract for the improvement of real property shall contain
a covenant by the assignor that he will receive any moneys advanced
thereunder by the assignee and will hold the right to receive such
moneys as trust funds to be first applied to the payment of trust claims
as defined in section seventy-one of the lien law, and that he will
apply the same to such payments only, before using any part of the
moneys for any other purpose.
§ 14 Assignment of lien
§ 14. Assignment of lien. A lien, filed as prescribed in this article,
may be assigned by a written instrument signed and acknowledged by the
lienor, at any time before the discharge thereof. Such assignment shall
contain the names and places of residence of the assignor and assignee,
the amount of the lien and the date of filing the notice of lien, and be
filed in the office where the notice of the lien assigned is filed. The
facts relating to such an assignment and the names of the assignee shall
be entered by the proper officer in the book where the notice of lien is
entered and opposite the entry thereof. Unless such assignment is filed,
the assignee need not be made a defendant in an action to foreclose a
mortgage, lien or other incumbrance. A payment made by the owner of the
real property subject to the lien assigned or by his agent or
contractor, or by the contractor of a public corporation, to the
original lienor, on account of such lien, without notice of such
assignment and before the same is filed, shall be valid and of full
force and effect. Except as prescribed herein, the validity of an
assignment of a lien shall not be affected by a failure to file the
same.
§ 15 Assignments of contracts and orders to be filed
§ 15. Assignments of contracts and orders to be filed. 1. No
assignment of one or more contracts for the performance of labor or the
furnishing of materials for the improvement of real property or of the
money or any part thereof due or to become due therefor, nor an order
drawn by a contractor upon the owner of such real property for the
payment of such money, nor an order drawn by a subcontractor upon a
contractor or subcontractor for such payment, nor an order drawn by an
owner upon the maker of a building loan, nor an assignment of moneys due
or to grow due under a building loan contract, shall operate to reduce
the lien of a subcontractor, laborer or materialman, except as provided
in sections thirteen and twenty-six of this chapter; nor shall any such
assignment or order be valid for any purpose, unless a "Notice of
Assignment" meeting the requirements of subdivision two of this section
or the contract (other than a building loan contract) or a statement
containing the substance thereof and such assignment or a copy of each
or a copy of such order, be filed within ten days after the date of such
assignment or such order, in the office of the county clerk of each
county wherein real property improved or to be improved to which the
assignment or order relates is situated and such assignment or order
shall have effect and be enforceable from the time of such filing, and
no such assignment or order shall have any validity until the same shall
have been so filed, and every such assignment or order, not filed shall
be absolutely void as against a subsequent assignee in good faith and
for valuable consideration, whose assignment or order is first duly
filed. Such clerk shall enter the facts relating to such assignment or
order in the "lien docket" or in another book provided by him for such
purpose. Each such assignment shall be indexed by the name of the
assignor and each such order shall be indexed by the name of the drawer.
2. A "Notice of Assignment" filed pursuant to subdivision one of this
section shall be used only in the case of money advanced or to be
advanced to a contractor or subcontractor upon the assignment of one or
more contracts for the performance of labor or the furnishing of
materials for the improvement of real property, or of the money or any
part thereof due or to become due therefor. The said notice shall
contain (a) the names and addresses of the assignor and assignee, (b)
the date of the assignment, and the date the assignment will terminate,
which termination date shall not be more than two years after the date
of the assignment, (c) the maximum balance of advances outstanding to be
secured by the assignment, (d) a statement of each county wherein the
real property involved in the contracts is or may be situated, and (e)
either a specific description of the substance of the contract or
contracts assigned, including an identification of the real property
involved in each such contract, or a statement that the assignment
covers all or a specified class of the assignor's accounts or contract
rights. If the contract or contracts assigned are described specifically
the real property identification shall be sufficient if it includes the
name of the record owner and the location of the real estate by street
and number and town or city or, if the real estate is in the city of New
York, by county, except that if the real estate is in the city of New
York or counties of Nassau or Onondaga, where the block system of
recording or registering and indexing conveyances is in use, the notice
must also specify the block in which the real estate is situated.
3. A "Notice of Assignment" may be continued in effect beyond the
stated termination date by filing within sixty days prior to the
termination date a subsequent "Notice of Assignment" entitled "Second
Notice of Assignment" or "Third Notice of Assignment", which identifies
the prior "Notice of Assignment" to which it relates and otherwise
conforms to the requirements of subdivision two of this section.
4. The term "Notice of Assignment" as used in this section includes
any amendments but if any amendment extends the assignment to cover
additional contracts it is effective as to the added contracts only from
the date of the filing.
§ 16 Assignment of contracts and orders for public improvement to be filed
§ 16. Assignment of contracts and orders for public improvement to be
filed. No assignment of a contract for the performance of labor or the
furnishing of materials for a public improvement, or of the money, or
any part thereof, due, or to become due, therefor, nor an order drawn by
the contractor or sub-contractor upon the public corporation, or the
head of the department or bureau having charge of the construction or
demolition of such public improvement, or the financial officer of the
public corporation, or other officer or person charged with the custody
and disbursement of the corporate funds applicable to the contract for
such public improvement, shall be valid unless such assignment or order,
or a copy thereof, be filed within twenty days after the date of such
assignment of contract, or such assignment of money, or such order, with
the head of the department or bureau having charge of such construction
or demolition, and with the financial officer of the public corporation
or other officer or person charged with the custody and disbursement of
the corporate funds applicable to the contract for such public
improvement, and such assignment or order shall have effect and be
enforceable from the time of such filing, and no such assignment or
order shall have any validity until the same shall have been so filed,
and every such assignment or order, not filed, shall be absolutely void
as against a subsequent assignee in good faith and for valuable
consideration, whose assignment or order is first duly filed. The
financial officer of the public corporation, or other officer or person
with whom the assignment order, or copy thereof, is filed, shall enter
the facts relating to the same in the lien book or other book provided
for such purpose.
§ 17 Duration of lien
§ 17. Duration of lien. No lien specified in this article shall be a
lien for a longer period than one year after the notice of lien has been
filed, unless within that time an action is commenced to foreclose the
lien, and a notice of the pendency of such action, whether in a court of
record or in a court not of record, is filed with the county clerk of
the county in which the notice of lien is filed, containing the names of
the parties to the action, the object of the action, a brief description
of the real property affected thereby, and the time of filing the notice
of lien; or unless an extension to such lien, except for a lien on real
property improved or to be improved with a single family dwelling, is
filed with the county clerk of the county in which the notice of lien is
filed within one year from the filing of the original notice of lien,
continuing such lien and such lien shall be redocketed as of the date of
filing such extension. Such extension shall contain the names of the
lienor and the owner of the real property against whose interest therein
such lien is claimed, a brief description of the real property affected
by such lien, the amount of such lien, and the date of filing the notice
of lien. No lien shall be continued by such extension for more than one
year from the filing thereof. In the event an action is not commenced to
foreclose the lien within such extended period, such lien shall be
extinguished unless an order be granted by a court of record or a judge
or justice thereof, continuing such lien, and such lien shall be
redocketed as of the date of granting such order and a statement made
that such lien is continued by virtue of such order. A lien on real
property improved or to be improved with a single family dwelling may
only be extended by an order of a court of record,
The text continues in the official source.
